Work to be Done on Our New Boat

We have just recently bought our Harstad 31′ and have not yet had the chance to sail her, although we did a bit of a sea trial with the previous owner before consummating the deal.  The diesel ran great and the sails went up and down without a hitch.  The paint is all in good condition and it has a shine to it.  Some of the woodwork will need a light refinishing, but all and all it is in really great condition.

The following are areas to be worked on:

  • Tachometer needs to be connected/fixed
  • Choke cable needs to be lubricated
  • Fuel meter (sender unit) needs to be fixed – it only partially works
  • Although the volt meter and switch panel seem to be in great shape, I need to check them
  • Mizzen mast halyard was pulled to the top somehow and the end hook needs to be retrieved
  • Check the  fresh water system to make sure the pressure water does not have any leaks
  • Test hot water heater
  • Test bilge blower

Beyond that, there isn’t much else that needs attention.  The boat is clean as a pin and looks great!

Published in: General Postings on October 9, 2009 at7:33 am Comments (0)
Tags:


The URI to TrackBack this entry is: http://harstad31.coolblogsite.com/2009/10/09/work-to-be-done-on-our-new-boat/trackback/

RSS feed for comments on this post.

Leave a Comment